Completed Projects
BHPIO and BHP Engineering
Primary Crusher repairs and mods for B.H.P.I.O Newman
In pit crusher mods for B.H.P.E. Newman
-
Supply and shutdown installation/commissioning of conveyor
-
Discharge modification relocation of crusher and repairs to screen
Stacker boom repairs and hopper mods for B.H.P.E. Newman
-
Major shutdown works to perform structural repairs and changes
Primary crusher dump bay widening and hopper mods for B.H.P.E. Newman
-
Structural column relocation and building mods and associated dump chute mods, shutdown
Conveyor skirt mods in concentrator for B.H.P.E. Newman
-
Major shutdown works to production equipment
Haul truck workshop extension B.H.P. Newman
-
Design and construct service bay upgrade structural extension and civil works
Over size reclaim conveyor and associated steel work Newman
-
Reinstatement of 50m conveyor boom from Pt. Hedland to Newman
Sample plant construction ore body 29 Newman
-
Supply installation and commissioning of steelwork and mechanicals
Fabricated chutes sumps pipework for B.H.P.E. and B.H.P.I.O. Newman
-
Detailing, fabrication, Q.A.& Q.C.
Remedial works upgrade, wet plant for Fluor Daniel Newman
-
Cyclone modifications
-
Cone and sump plant mods
-
Pumping upgrade
-
Wet screen feed mods
-
Instrumentation upgrade
-
Electrical upgrade
-
Commissioning of screens, variable speed pumps, cyclones and pipe work
ANFO bulk stores repairs
-
Structural and concrete repairs
Thickener rake repairs
-
Major structural repairs during breakdown shutdown including sandblasting and painting
ANFO truck washdown facility
-
Turnkey project including earthworks, concrete works, structural, mechanical, pipe work, electrical and commissioning
Transfer tower replacement
-
Structural steelwork detail fabricate and construction
-
Stainless steel chute work
-
Pulleys, drives and skirts
Cyclone, drum and spirals plant upgrade
Major upgrade within operating plant and culminating in a 7 day shutdown including:
-
Demolition of existing cones plant and support structures
-
Detailing, fabrication, painting and structural steel installation
-
Internal mods to heavy media separation drums
-
Rubber lined chutes and hoppers
-
Pumps and rubber lined pipe work
-
Testing and commissioning of new installations
Miscellaneous minor works
-
Everyday maintenance works, value in excess of $2m annually
Projects for Hamersley Iron, Minenco and Joint Ventures
Bio Remediation plant at Paraburdoo
-
Supply and installation of steelwork, pipe work and pumping system
Water recovery dam at Tom Price
-
Supply, installation and commissioning of pontoon, pumping station pipe work, mechanical and electrical equipment
Southern Fortescue River pumping station
-
Design of pressure vessel, supply installation and commissioning of equipments, Including electrical and instrumentation works
Power station structural modifications and roller doors for H.I. at Paraburdoo
-
Supply, installation and commissioning of large electric roller doors. Including structural, mechanical and electrical
Conveyor scrap collecting magnet at Paraburdoo
-
Structural, mechanical, civil, electrical and instrumentation supply, installation and commissioning of 14T electromagnet and monorail
Relocate Primary crusher Hydraulics and pipe work at Tom Price
-
Mechanical, hydraulics and pipe work
Seal belt and steelwork installation, 9M tripper at Tom Price
-
Structural and mechanical shutdown installation
Sample plant installations, commissioning and punch lists at Marandoo
-
Supervision of commissioning crew for automated sample plant
Fines load out hydraulic room design and installation of oil pipe work Tom Price
-
Pipe work, mechanical design, construction and commissioning
Drill component storage facilities
-
Civil and structural design and construction
Locomotive service gantries and facilities at Paraburdoo
-
Civil, electrical, mechanical and structural design and construction
21M 21AM Transfer chute replacement
-
Fabrication and installation of new design impact frame and chute
Heavy equipment wash facilities Paraburdoo
-
Fabrication and installation of towers and platforms with water monitors
Rockbreaker hydraulics relocation Tom Price
-
Welded high-pressure pipework and equipment relocation and commissioning
Dust suppression sprays, primary crusher Tom Price
-
Replacement of corroded steelwork
Skirts and guards at Transfers Marandoo
-
Upgrade of skirting and guards on conveyors
New steelwork for cyclone plant Tom Price
-
Replacement of corroded steelwork
Experimental tertiary crusher (60inch Symonds cone) Tom Price
-
Civil structural, mechanical and electrical design, construction and subsequent operation of crusher to determine optimum liner profiles
Ore storage bin shuttle modifications for H.I. Marandoo
-
Design, fabrication and installation of structural and mechanical components and successful commissioning to shuttle which previously was inadequate
Structural steel replacement of H.I. Tom Price
-
Fabrication and replacement of corroded or damaged structural members on high-grade loadout circuit, including sandblasting and painting
Other Clients
Engineering design and consultation to Alcoa Australia
-
Project management and design engineering services at Pinjarra refinery for pumping and vessel upgrades in digestion and precipitation area
Freezer warehouse and seafood process plat for Southern Trading Co. Perth
-
Design, project management and construction of industrial buildings, refrigeration equipment and office development, including all disciplines
Salt fines recovery plant for Cargill Salt at Port Hedland
-
Pipework supply installation and commissioning for wash plant expansion, using plastic and conventional systems
Rill tower replacement on crusher stockpile feed for ‘Gidgee Gold’ at Gidgee
-
Supply and replace rill tower below primary conveyor and replace wear liners
-
Shutdown mobilisation to site
Wharf modifications for Dampier Salt at Cape Couvier
-
Gangplank modifications including detailed drawings supply and installation of structural steel, hydraulic pipework, platforms and timber decking, all in virtually impossible positions
Re-building of earthmoving equipment for Clough’s at Jimbalbar
-
Complete re-build and hard facing of worn out components on loader and shovel buckets and truck trays
Construction of stockpile and load-out facility for Leighton Contractors at H.I. Yandi
-
Installation of overland conveyor systems up to 2.5km long
-
Installation of underground feed conveyor below the stockpile
-
Installation of 6 underground feeder stations complete with feeders
-
Installation of 36m high train load-out bin complete with automatic feed gate
-
Fabrication and installation of all water, air and hydraulic pipework
-
Installation of all mechanical equipment for a working plant
-
Testing and commissioning of all plant
Regular labour hire to Henry Walker Eltin at Yandi Mine Site
-
Hire of ten to fifteen trades personnel on a weekly basis for plant shut-down work
Regular labour hire to B.G.C. Contracting at Jimbalbar Mine Site
-
Hire trades personnel on an as-required basis
The value of the above works represents a turnover of approximately $55m. The above work is general noted for its difficulty, often-limited access, working amongst operating plant and tight performance schedules.